56' Custom Build

New Toll Free Phone Number    866-921-2628

1956 Custom Build  (page 2)

270-866-2628  Paul@woodiesrestorations.com

Update: 4/4/2012

Before varnish coat

After varnish coat (not final coat)

Preparing for final coat (7-3-12)

9/20/12

Wet sanding sides

9/25/12

10/2/12

Sanding to paint second coat of white paint

Cutting flooring to fit panels

10/3/12

Flooring panels being fitted to later to be removed so they can be covered in marmoleum flooring

10/4/12 Washing and buffing side of boat

Fitting more floor panels

10/5/12 painted the inside of hatch area Completed floor panels ready to be installed

Buffing interior stainless pieces

10/8/12

Interior side panels and flooring panels installed

Building bow stop for trailer

10/9/12

10/15/12

Waterline stripe and chrome trim added

Installing block for lifting rod

Bow trim piece Bow light

Crud in old tank

Old and new tank side by side

10/16/12

10/17/12

Scanning the engine to get the EXACT color of the paint made 10/18/12

Speaker installed for back seats

10/25/12

Radio and Sirius reciever

10/29/12 These are all Before and After photos After Before

11/27/12

Updates 11/28/12

Updates 11/29/12

The points were set to .040" (forty thousanths) gap. They should not have been Wider than  .020 gap

2 spark plugs were not firing as a result of sitting for years...Gee we might get from 2000 RPM to 3000 RPM or even more with all 6 plugs firing!

Broken rotor prevented engine from being timed

Design a Mobile Site
View Site in Mobile | Classic
Share by: